Our Projects

Every project we take on is guided by one mission:

Deliver quality safely, on time, and within budget

Biomass Boiler

Value: $900,000

}

Man Hours: 41, 123

The project works included the complete turnkey installation, integration, and commissioning of a 20 t/h biomass boiler system, covering structural erection, mechanical fuel handling and boiler core, thermal insulation, refractories, full electrical and instrumentation systems, quality control, and final handover. 

Bulk Fuel Storage

Value: $12,000,000

}

Man Hours: 330,636

Bulk Fuel Storage and Reticulation System. The project works included the provision of all labor, materials, equipment, logistics, delivery (DAP Moatize Site), installation, commissioning, and handover of a complete bulk fuel storage and reticulation system, integrated with the existing fuel storage infrastructure.

Dedicated Flotation CPP1

Value: $3,480,000

}

Man Hours: 101,449 

The project works included the full erection, installation, assembly, testing, and commissioning of two dedicated flotation plants (CHPP#01 and CHPP#02), encompassing structural steel, mechanical equipment, platework, piping, electrical systems, instrumentation, and control integration.

Dedicated Flotation CPP2

Value: $4,571,000

}

Man Hours: 102,965.50

The project works included the full erection, installation, assembly, testing, and commissioning of two dedicated flotation plants (CHPP#01 and CHPP#02), encompassing structural steel, mechanical equipment, platework, piping, electrical systems, instrumentation, and control integration.

Maintenance & Shutdowns

Value: $26,000,000

}

Man Hours: +1,100,000

Electromechanical Assembly and Maintenance Support – Vale Moatize Operations . The project works included the provision of fully equipped, multidisciplinary manpower for comprehensive electromechanical assembly, maintenance, and operational support across all Vale Moatize operational areas in Tete, Mozambique.

Rail Decanting

Value: $4,000,000

}

Man Hours: 119,112

The project works included the basic and detailed design, supply and delivery of materials to site, installation, and commissioning of a 600-meter rail decanting slab for bulk fuel unloading, along with associated pump stations, skids, piping, and infrastructure, compliant with API, NFPA, and CDN standards. 

Reagents Upgrade

Value: $3,000,000

}

Man Hours: 32,533

The project works included the turnkey installation and commissioning of three reagent dosing systems (Frother, Collector, Flocculent) at Vale Moatize CPP-1, replacing and upgrading existing infrastructure across two flotation plants (12 cells total) and two HBVF plants (6 filters total), executed in two phases.

Thermal Coal

Value: $2,800,000

}

Man Hours: 191,921

The project works included the complete erection, assembly, integration, and commissioning of a 2,400 TPH thermal coal handling and stockpiling system at Stockyard 4, comprising six conveyors, two vibrating screens, a luffing stacker, four transfer towers, and full EC&I infrastructure.

Other Projects

Steel Fly Ash Silo

Year: 2025

Client: Vulcan

Value: $300,000

Duration: 2.5 Months

Manhours: In Progress

Electromechanical Assembly and Maintenance Support – Vale Moatize Operations . The project works included the provision of fully equipped, multidisciplinary manpower for comprehensive electromechanical assembly, maintenance, and operational support across all Vale Moatize operational areas in Tete, Mozambique.

Vibrating Screen Replacement 

Year: 2025

Client: Vulcan

Value: $1,500,000

Duration: 12 Months

Manhours: 10,000

The project works included the comprehensive replacement of 25 vibrating screens across multiple units, involving full unit removals, partial dismantlings, and precise installations to upgrade screening capacity and performance. 

Thermal Coal Project 

Year: 2024

Client: Vulcan

Value: $2,800,000

Duration: 5 Months

Manhours: 191,921 

The project works included the complete erection, assembly, integration, and commissioning of a 2,400 TPH thermal coal handling and stockpiling system at Stockyard 4, comprising six conveyors, two vibrating screens, a luffing stacker, four transfer towers, and full EC&I infrastructure. 

Pilot Plant

Year: 2024

Client: Vulcan

Value: $200,000

Duration: 1 Month

Manhours: 1,800

The project works included the complete erection, installation, assembly, testing, and commissioning of a fully integrated pilot processing plant, covering structural steel, mechanical equipment, platework, piping, electrical systems, instrumentation, and automation integration.

Electromechanical Maintenance

Year: 2024 – Present

Client: Vulcan

Value: $5,000,000

Duration: 24 Months

Manhours: 206,640 In progress

The project works included the provision of skilled, equipped manpower and specialized equipment for high-complexity electromechanical maintenance, repairs, and asset improvement projects across CHPP1, CHPP2, and stockyard operations.

Thickener and Filtration System

Year: 2022

Client: Vulcan

Value: $3,200,000

Duration: 5 Months

Manhours: 201,522.5 

The project works included the installation, modification, and integration of high-level process piping, tanks, and support structures across four processing plants (Plant A, Plant B, Plant C, Plant D), with critical operations at elevations up to 26 meters.

Assisted Operations

Year: 2018 – 2020

Client: Vale

Value: $16,000,000 

Duration: 31 Months

Manhours: 790,438

Electromechanical Assembly, Commissioning Support, and Assisted Operation. The project works included the provision of fully equipped, multidisciplinary manpower for electromechanical assembly, commissioning, operational support, maintenance, and asset modification across all Vale Moatize operational areas in Tete, Mozambique.

Borehole & Reticulation System

Year: 2020

Client: Vale

Value: $900,000

Duration: 9 Months

Manhours: 23,424

The project works included the drilling and construction of one production borehole in the Revúbuè Wellfield area to enhance raw water supply capacity for the Moatize Mine, along with reticulation system tie-ins, hydraulic analysis, infrastructure specification, mechanical and civil installations, electrical/instrumentation/control systems, and comprehensive site management.

Reclaimer Reinforcement

Year: 2019

Client: CLN

Value: $687,000

Duration: 2 Months

Manhours: 15,966 

The project works included the manufacture, supply, installation planning, and execution of structural reinforcements and functional improvements on the gantry and slew sections of Reclaimers 01 and 02 at the CLN Nacala Coal Terminal, ensuring zero operational downtime by executing works on one machine at a time. 

Rail Locomotive Fueling

Year: 2018

Client: CLN

Value: $1,300,000

Duration: 8 Months

Manhours: 56,024

The project works included the relocation, re-elevation, and full reinstallation of existing containerized fuel tanks to align with the main fuel storage level, along with civil modifications, structural enhancements, VFP (Vendor-Furnished Package) equipment integration, safety upgrades, and storage solutions. 

Management Camp Power

Year: 2018

Client: Battery Minerals

Value: $500,000

Duration: 2 Months

Manhours: 10,800

The project works included the full turnkey electrical design, supply, delivery, installation, termination, testing, and commissioning of a comprehensive power reticulation system for the Suni Resources Management Camp at Battery Minerals’ Balama Graphite Mine, covering generators, main distribution, sub-distribution kiosks, extensive cabling to all facilities, and optional perimeter security lighting.